2018/12/25
Late farewell to Bengbu, within a hundred miles, Shanghai will arrive tomorrow. "My brother had just arrived at Line B of Shanghai Metro Line 15 when I hurriedly arrived at A. This morning, I had already descended from the well, so tall. Fortunately, my mind was not filled with fear, and my master only installed diligence for me.
My ability is also to transport concrete and then pour it, but it requires manual cooperation to achieve twice the result with half the effort. My feet have two ways: tires and inner rails, among which the tires can be angled and suitable for various working conditions.
I believe that in the near future, I will also be able to use AI technology, which will make me even more capable.
Construction site
Delivery of goods to the site
Receiving materials
During cutting and pouring