All categories
0

China Railway 14th Bureau Group Fifth Engineering Co., Ltd

2019/3/25

   China Railway 14th Bureau Group Fifth Engineering Co.,Ltd.(Beijing)

  The 8-way self deformable wheel rail concrete construction vehicle purchased by China Railway 14th Bureau Group Fifth Engineering Co.,Ltd.started the foundation pouring(tunnel arc diameter of 7.9 meters,foundation thickness of 40CM,width of 2.8 meters)on March 15,2019 on the Beijing Daxing District Rail Transit New Airport Line,with a total length of 1.3 kilometers.





The entire equipment operation personnel are entrusted by China Railway 14th Bureau to be provided by our company, ensuring a progress of 180 meters per day.
Xingyu people uphold the spirit of love for their work and dedication to serving customers wholeheartedly, and promote the spiritual culture of the enterprise. To contribute to the early completion of the airport line of China Railway 14th Bureau and smoothly welcome the arrival of the 70th anniversary of the great motherland.



8方搅拌车现场施工中



施工后


完工后兴宇人集体照


Related information